´╗┐No. Project Location Nature of Work Commencement Completion
1 Pembinaan Pejabat Dan Pusat Latihan Unit komando 69, Pasukan Gerak Khas, Ulu Kinta, Perak Darul Ridzuan Ulu Kinta, Perak Soil Nailing Works, Guniting Works, Horizontal Drain Works Mar-19 Dec-19
2 Site clearance, earthworks and retaining wall system for cadangan pindaan kebenaran merancang yang diluluskan melalui perintah 15 februari 2016 bagi pembangunan kediaman di atas lot 7585-7589, lot 7597-7600 dan P.T No 15231, Jalan 6/154D, Persiaran Alam Damai, Alam Damai Kuala Lumpur untuk Tetuan GLM Alam Damai Sdn Bhd Alam Damai, Cheras Soil Nailing Works, Guniting Works, Horizontal Drain Works Apr-17 Mar-19
3 Ampang Line (AMG) Extension LRT Project (Package A - Guniting Works At PIER 203 - PIER 206 Ampang Guniting Works Jan-17 Mar-17
4 Station 01 Mix Development On Lot 38568 Off Jalan 1/155B, Bukit Jalil, Kuala Lumpur - Construction & Completion Of Infrastructure Works Inclusive Of Main Access Road, Underpass, CBP Wall, Surface Carpark Etc. Bukit Jalil Horizontal Drain Works Jun-16 Jun-16
5 Proposed Renovation And Extension Of A 3-Storey Factory Building With A Mezzanine Floor For Subang Jaya Church Subang Jaya, Selangor Piling Works Aug-15 Nov-15
6 Electrified Double Tracking Project Between Ipoh And Padang Besar Ipoh Horizontal Drain Works May-15 Jul-15
7 Projek Jalan Akses Ke Empangan Murum, Bah Kapit, Sarawak: Sek B Pkj 2 [Highway Project] Empangan Murum, Sarawak Rock Bolt & Guniting (Slope Stabilisation ) Apr-13 Nov-13
8 Slope Repair Works At Lot 1611 Hulu Kelang, Gombak, Selangor For Harta Villa Sdn. Bhd, Hulu Kelang, Gombak Soil Nail & Guniting (Slope Stabilisation) Jan-13 Apr-13
9 Cadangan Pembinaan 45 Unit Rumah Sesebuah Dan 1 Unit Pencawang Elektrik 1 Tingkat Di Atas Lot 12991, PT14534, PT 14533 (KD1) Dan PT 14532 (KD2), Bukit Indah, Mukim Hulu Kelang, Daerah Gombak, Selangor Darul Ehsan Untuk Tetuan Syarikat Kemajuan Jerai Sdn. Bhd. Bukit Indah, Gombak Rock Bolt & Guniting (Slope Stabilisation ) Sep-12 Nov-12
10 Soil Nail & Gunite For Project On Lot 527 Mukim Bertam, Daerah Melaka Tengah - Melaka. Bertam, Melaka Soil Nail & Guniting (Slope Stabilisation) Apr-12 May-12
11 Projek Lebuhraya Pantai Timur Fasa 2, Terengganu [Pakej 9B: Dari Ch. 102,500 Ke Ch. 107,700 (Hutan Simpan Bukit Bauk( - Menyiapkan Baki Kerja Yang Belum Siap], Daerah Dungun, Terengganu. [Highway Project] Dungun, Trengganu Horizontal Drain Works (Slope Stabilisation) Mar-12 Oct-12
12 Design And Built Contract For The Completion Of Kajang - Seremban Highway (Package 1B, 2A, 2B & 3). [Highway Project] Bridge 16, Kajang - Seremban Highway Guniting Works (Slope Stabilisation) Jan-12 Apr-12
13 Proposed Monorail Depot Upgrading Works For KL Monorail Fleet Expansion Project. Brickfields, KL Micropile (Foundation works) Jul-11 Feb-12
14 Pembangunan Bercampur Di Atas Lot 15687, Seluas 90.55 Ekar, Mukim Hulu Kelang, Daerah Gombak, Selangor Darul Ehsan Untuk Tetuan Sierra Ukay Sdn. Bhd. Ukay Green, Gombak Soil Nail & Guniting Works (Slope Stabilisation) May-11 Jul-11
15 Mobilization, Demobilization, Soil Nailing & Guniting For Slope Strengthening Works On Lot 527 Near Water Tank Mukim Bertam, Daerah Melaka Tengan - Melaka. Bertam, Melaka Soil Nail & Guniting (Slope Stabilisation) Apr-11 Jun-11
16 Completion of Main Building Works for 23 Units Bungalow & 10 Units Semi-D, Bukit Mandarina, Cheras - Phase 5. Cheras, KL Rock Dowels & Guniting (Rock Slope Stabilisation) Feb-11 Jun-11
17 Micropile, Nailing & Guniting For Slope Strengthening Works Between Lot 553 & 393 Mukim Bertam, Daerah Melaka Tengah - Melaka. Bertam, Melaka Micropile (Foundation) Soil Nail & Guniting (Slope Stabilisation) Dec-10 Mar-11
18 Design And Build Contract For The Completion Of Kajang - Seremban Highway (Package 1B, 2A, 2B & 3). [Highway Project] Phase II, LEKAS Highway Horizontal Drains (Slope Stabilisation) Feb-10 Mar-10
19 Design And Build Contract For The Completion Of Kajang - Seremban Highway (Package 1B, 2A, 2B & 3). [Highway Project] Phase II, LEKAS Highway Horizontal Drains (Slope Stabilisation Aug-09 Sep-09
20 Cadangan pembangunan 530 unit kediaman apartment di sebahagian tanah kerajaan seluas 7.85 ekar, Jalan Kuari, Cheras Baru, Mukim Ampang, Daerah Hulu Langat, Selangor. Jalan Kuari, Cheras Guniting (Rock Slope Stabilisation) Mar-09 May-09
21 Slope Stabilization For Cadangan Pembangunan bercampur Di Atas Lot 15687, Seluas 90.55 Ekar, Mukim Hulu Kelang, Daerah Gombak, Selangor Darul Ehsan Untuk Tetuan Sierra Ukay Sdn Bhd (Ukay Green). Gombak, Selangor. Soil Nail & Guniting (Slope Stabilisation) Mar-08 Oct-09
22 Slope Stabilisation Works For Cadangan Pembinaan 252 Unit Rumah Teres 2 1/2 Tingkat (Superlink) Yang Mengandungi 102 Unit RT-A, 3 Unit RT-A1, 6 Unit RT-A2, 67 Unit RT-B, 39 Unit RT-C Dan 35 Unit RT-D Diatas Sebahagian Lot PT 13431 HS(D) 20084, Mukim Hulu Kelang, Daerah Gombak, Selangor Untuk Tetuan Ukay Land Sdn Bhd. Gombak, Selangor Rock Bolt (Slope Stabilisation) Dec-07 Jul-09
23 Design And Build Contract For Privitisation Of Lebuhraya Kajang - Seremban. [Highway Project] Phase I, LEKAS Highway Horizontal Drains (Slope Stabilisation) Sep-07 Apr-08
24 North South Expressway Third Lane Widening Between Rawang And Tanjung Malim (Package 3A1). Rawang Soil Nail (Slope Stabilisation) Aug-07 Nov-07
25 Soil Works at Bukit Manda'rina (High Cost Apartments). Cheras, K. L. Soil Nail & Guniting (Slope Stabilisation) Mar-07 Sep-07
26 Guniting (sprayed concrete) works to Gunung Lang. Gunung Lang, Perak Guniting (Slope Stabilisation) Jan-07 May-07
27 Proposed mixed-use development of one 30-storey commercial building on Lot 162, Sek 63 for M/S La Residence Sdn. Bhd. Jalan Tun Razak, K.L. Guniting (Slope Protection) Sep-06 Nov-06
28 Cadangan pembangunan 530 unit kediaman apartment di sebahagian tanah kerajaan seluas 7.85 ekar, Jalan Kuari, Cheras Baru, Mukim Ampang, Daerah Hulu Langat, Selangor. Jalan Kuari, Cheras Rock Bolt, Guniting, Rock Netting, Dentition works (Slope Stabilisation) Jun-06 Jun-07
29 Pembinaan Jalan Pos Betau-Lembah Bertam, Pahang, Pakej 4: Kg. Susu/Sg. Bertam ke Ringlet, Pahang secara "Design and Build". [Highway Project] Cameron Highlands Micro Bored Pile & Micropile (Foundation Works) May-06 Feb-08
30 Kerja-kerja membaikpulih cerun runtuh di ibu pejabat polis Bukit Aman, Pulapol dan Muzium Polis di Kuala Lumpur. Bukit Aman, K.L Soil Nail (Slope Stabilisation) Mar-06 May-06
31 Pembinaan Jalan Pos Betau-Lembah Bertam, Pahang, Pakej 4: Kg. Susu/Sg. Bertam ke Ringlet, Pahang secara "Design and Build". [Highway Project] Cameron Highlands Soil Nail & Guniting (Slope Stabilisation) Nov-05 Feb-08
32 Proposed remedial works to slope failure at Km9 (Northbound), Lebuhraya Damansara - Puchong - slope adjacent to SS22/32. LDP, Selangor Soil Nail (Slope Stabilisation) Oct-05 Nov-05
33 1 block pejabat kerajaan (Jabatan Peguam Negara) plot 4G7. Putrajaya, Selangor Guniting (Slope Stabilisation) Jul-05 Dec-05
34 Kajang Traffic Dispersal Ring Road. Kajang, Selangor Slope Stabilisation Oct-04 Jan-05
35 Proposed construction and completion of Kuang System Interchange and North-South Expressway Access Kuang Slope Stabilisation Jun-04 Mar-05
36 Proposed completion of balance work at Simpang Pulai-Lojing-Gua Musang-Kuala Behrang Road. Package No. 3/1A (Lojing to KM 10) [Highway Project] Cameron Highlands Slope Stabilisation Jun-04 Jul-05
37 Proposed rock dowel at Cheras Hartamas Cheras, KL Slope Stabilisation May-04 Jun-04
38 Proposed upgrade of persekutuan 68 Road from Simpang Tiga Lee Rubber to Universiti Islam Malaysia Gombak Slope Stabilisation May-04 Jun-04
39 Propsoed slope stabilisation work at KM 326.85 South bound section C1 (Tapah to Bidor Expressway) Tapah Interchange, Perak Slope Stabilisation Mar-04 Mar-04
40 Proposed Western Kuala Lumpur Traffic Dispersal Scheme. (Package C) Damansara Slope Stabilisation Dec-03 Feb-04
41 Proposed construction & completion of the Southern Inner Ring Road for Pusat Pentadbiran Kerajaan Persekutuan Putrajaya (Package C) Putrajaya, KL Slope Stabilisation Oct-03 Nov-04
42 Proposed site clearing earthwork and ancillary work for Phase 5 at Taman Pelangi Indah, Johor Johor Bahru Ground Anchor Jun-03 Jul-03
43 Proposed slope stabilisation work at Ukay Heights, Ampang Ampang, KL Slope Stabilisation Mar-03 Jul-03
44 Proposed East-West Highway Project(Titi Karangan-Gerik9. Phase 2, Package NO. 4 (Kupang to Gerik) [Highway Project] Kupang, Kedah Slope Stabilisation Jan-03 Jul-04
45 Proposed Guthrie Corridor Expressway [Highway Project] Sg. Buloh Slope Stabilisation Jul-02 Feb-04
46 Proposed development Cheras, KL Slope Stabilisation May-02 Jun-02
47 Proposed slope stabilisation work at Kerteh Railway Project Kerteh, Terengganu Slope Stabilisation Feb-02 May-02
48 Proposed slope stabilisation work at Sri Ehsan Kepong Slope Stabilisation Nov-01 Dec-01
49 Upgrade of Benta-Jerantut-Maran Road, Pahang.Phase 2 (Bandar Jerantut to Persimpangan Jengka) Jerantut, Pahang Slope Stabilisation Jul-01 Oct-01
50 Proposed slope stabilisation on Lot Nos. 2635, 3734 and 3882, Mukim Batu Gombak Slope Rockfall & Weathering Aug-00 Dec-00
51 Proposed Police HQ building and living quarters Selayang Slope Stabilisation Jun-00 Aug-00
52 Proposed Simpang Pulai-Lojing-Gua Musang-Kuala Behrang Road [Highway Project] Cameron Highlands Slope Stabilisation Nov-99 Oct-02
53 Proposed Pos Betau-Lembah Bertam Road, Pahang. Package No. 1A (Sungai Koyan to Pos Betau) [Highway Project] Sg. Koyan Slope Stabilisation Sep-99 Aug-02
54 Proposed Sulaman KK Coastal Road [Highway Project] Sabah Slope Stabilisation Dec-98 Apr-01
55 Proposed Express Rail Link Serdang Slope Stabilisation Mar-98 Mar-98
56 Titan Cracker No. 2 project Pasir Gudang, Johor Foundation Work Mar-98 Mar-98
57 Proposed slope stabilisaton work at Lorong Setia Puspa Damansara Slope Stabilisation Mar-98 Mar-98
58 Proposed Light Trail Transit System Two Wangsa Maju, KL Slope Stabilisation Jan-98 Feb-98
59 Proposed permanent re-alignment Gunung Tempurung Slope Stabilisation Nov-97 Jul-98
60 Proposed Tasek Desa Theme Park KL-Seremban highway Slope Stabilisation Oct-97 Jan-98
61 Proposed commercial development Johor Ground Anchor Sep-97 Dec-97
62 Boring works inside the tunnel Duta Plaza, KL Boring Aug-97 Aug-97
63 Proposed factory Kamunting, Taiping Soil Investigation Aug-97 Sep-97
64 Proposed commercial development Kuchai Lama, KL Ground Anchor Aug-97 Sep-97
65 Proposed slope strengthening to transmission tower Bukit Tinggi Slope Stabilisation Jul-97 Aug-97
66 Proposed Billion Court Resort Condominium Genting Highlands Slope Stabilisation Jul-97 Jul-97
67 Proposed slope stabilisation work at Lorong Setia Puspa Damansara Slope Stabilisation Jun-97 Jun-97
68 Proposed housing scheme Wangsa Maju, KL Foundation Work May-97 Aug-97
69 Proposed hotel resort Kemaman, Terengganu Foundation Work Apr-97 Apr-97
70 Proposed slope stabilisation work Genting Highlands Slope Stabilisation Mar-97 Mar-97
71 Upgrade of Brinchang-Lojing Road (Kampung Raja to Blue Valley) [Highway Project] Cameron Highlands Slope Stabilisation Mar-97 Dec-98
72 Access road in Tenom-Pangi hydrostation Tenom, Sabah Slope Stabilisation Feb-97 Jul-97
73 Proposed Majestic Square Jalan Othman, PJ Ground Anchor Nov-96 Feb-97
74 Proposed Berungis-Kota Belud Highway [Highway Project] Sabah Slope Stabilisation Sep-96 Mar-98
75 Proposed development Bangsar, KL Slope Stabilisation Jul-96 Nov-96
76 Proposed Plaza Rakyat Pudu, KL Ground Anchor Jun-96 Sep-96
77 Proposed development for Kulai Centrepoint Kulai, Johor Ground Anchor May-96 Oct-96
78 Proposed development Jalan Jelatek Slope Stabilisation Apr-96 May-96
79 Proposed development Gelang Patah Slope Stabilisation Mar-96 May-96
80 Proposed slope stabilisation work along Seremban highway Desa Petaling Slope Stabilisation Nov-95 Dec-95
81 Proposed Pelangi City Johor Bahru Ground Anchor Nov-95 Dec-95
82 Proposed office complex Damansara Heights Ground Anchor Aug-95 Aug-95
83 Proposed Pacific Mall Johor Bahru Ground Anchor Aug-95 Mar-96
84 Proposed workshop Kuantan Soil Investigation May-95 May-95
85 Proposed Middle Link Road Ulu Kelang Slope Stabilisation May-95 Aug-95
86 Proposed slope protection at access road Kepong Slope Stabilisation Apr-95 Apr-95
87 Proposed development for Shell Drive Property Port Dickson Slope Stabilisation Apr-95 Apr-95
88 Proposed development along Seremban Highway Seremban Soil Investigation Apr-95 May-95
89 Proposed factory Melaka Soil Investigation Feb-95 Mar-95
90 Proposed 6-storey building Petaling Jaya Foundation Work Dec-94 Feb-96
91 Proposed police contingent (Batu Baru) Melaka Slope Stabilisation Dec-94 May-96
92 Proposed LRT station Kampung Pandan Foundation Work Oct-94 Dec-94
93 Proposed Sem Siong complex Jalan Ipoh, KL Soil Investigation Jul-94 Sep-94
94 Proposed access ramp KLCC, KL Foundation Work Jun-94 Jun-95
95 Proposed railway bridge Seremban Foundation Work Jun-94 Jul-94
96 Proposed mini condominiums Damansara Heights Slope Stabilisation Jun-94 Oct-95
97 Proposed Low Yatt city Bukit Bintang Soil Investigation May-94 Jul-94
98 Proposed condominiums Batu Ferringghi Slope Stabilisation May-94 Aug-94
99 Proposed KL Tower (Phase 2) KL Slope Stabilisation May-94 Aug-94
100 Proposed North-South expressway (Package 8B-1A) [Highway Project] Saham to Gopeng Slope Stabilisation Nov-93 Dec-93
101 Proposed North-South expressway (Package 6C) [Highway Project] Bukit Merah to Kamunting Slope Stabilisation Nov-93 Dec-93
102 Proposed North-South expressway (Package 6B3) [Highway Project] Jawi to Alor Pongsu Slope Stabilisation Aug-93 Mar-94
103 Proposed condominiums Sg. Buloh Soil Investigation Jun-93 Jun-93
104 Proposed KL Tower (Phase 1) KL Slope Stabilisation Jun-93 Aug-93
105 Proposed factory Sg. Besi, KL Soil Investigation May-93 May-93
106 Proposed factory Sri Damansara Soil Investigation Apr-93 Apr-93
107 Proposed bus station Setapak, Kl Soil Investigation Apr-93 Apr-93
108 Proposed extension to factory Slim River, Perak Foundation Work Mar-93 May-93
109 Proposed North-South expressway [Highway Project] Alor Pongsu to Bukit Merah Slope Stabilisation Jan-93 Dec-93
110 Proposed development Fraser Hill Slope Stabilisation Dec-92 Dec-92
111 Proposed North-South expressway [Highway Project] Kulai, Johor Slope Stabilisation Dec-92 Dec-92
112 Proposed interchange Johor Bahru Foundation Work Aug-92 Oct-92
113 Proposed Tube A-Machette Grout NKVE, Bukit Raja Grouting Mar-92 May-92
114 Proposed North-South expressway Tapah, Perak Slope Stabilisation Feb-92 May-92
115 Proposed road (MOU Martello Project) Bukit Iban, Pahang Slope Stabilisation Feb-92 Sep-92
116 Proposed rubber glove factory Kuala Langat Soil Investigation Jan-92 Jan-92
117 Proposed NKVE slope protection [Highway Project] Sg. Buloh Slope Stabilisation Nov-91 Nov-91
118 Proposed NKVE slope protection [Highway Project] Damansara, PJ Slope Stabilisation Nov-91 Dec-91
119 Proposed Tuanku Jaafar Golf & Country Resort Seremban Soil Investigation Nov-91 Dec-91
120 Proposed NKVE slope protection [Highway Project] Subang, Selangor Slope Stabilisation Oct-91 Nov-91
121 Proposed road Bukit Iban, Pahang Soil Investigation Sep-91 Nov-91
122 Proposed extension of building Muzium Negara, KL Slope Stabilisation Aug-91 Aug-91
123 Proposed development Taman Melawati, KL Soil Investigation Aug-91 Aug-91
124 Proposed NKVE slope protection [Highway Project] Sg. Buloh Slope Stabilisation Jul-91 Dec-91
125 Proposed factory Selayang Baru Soil Investigation Apr-91 Apr-91
126 Proposed factory Taiping, Perak Soil Investigation Mar-91 Apr-91
127 Proposed NKVE slope protection [Highway Project] Rawang Slope Stabilisation Mar-91 Jun-91
128 Proposed road Sg. Tua, Batu Caves Slope Stabilisation Feb-91 Mar-91
129 Proposed development [Highway Project] Taman Melawati, KL Soil Investigation Feb-91 Mar-91
130 Proposed NKVE slope protection [Highway Project] NKVE 1, CH7000, Shah Alam Slope Stabilisation Feb-91 Apr-91
131 Proposed housing scheme Rawang Soil Investigation Jan-91 Jan-91
132 Proposed Kuala Lipis-Gua Musang road Kuala Lipis Slope Stabilisation Jan-91 Jan-91
133 Proposed development Rasah, Seremban Soil Investigation Jan-91 Jan-91
134 Proposed extension to factory Meru, Klang Foundation Work Jan-91 Apr-91
135 Propsed PNF godown Gebeng, Kuantan Soil Investigation Nov-90 Nov-90
136 Proposed tower Sg. Besi, KL Foundation Work Nov-90 Dec-90
137 Proposed factory Sabak Bernam Soil Investigation Nov-90 Dec-90
138 Proposed factory & warehouse office Shah Alam Soil Investigation Oct-90 Oct-90
139 Proposed NKVE slope protection Shah Alam Slope Stabilisation Oct-90 Oct-90
140 Proposed Bakri sub-station Muar, Johor Soil Investigation Oct-90 Nov-90
141 Proposed development Ampang Hilir Soil Investigation Sep-90 Sep-90
142 Proposed housing scheme Taman Mayang, PJ Soil Investigation Aug-90 Aug-90
143 Proposed industrial and residential development Rasah, Seremban Soil Investigation Aug-90 Aug-90
144 Proposed petrol station Balakong Soil Investigation Aug-90 Aug-90
145 Proposed road Temerloh Soil Investigation Aug-90 Aug-90
146 Proposed condominiums Ulu Kelang Soil Investigation Aug-90 Sep-90
147 Proposed condominiums Batu Ferringghi Soil Investigation Jun-90 Jul-90
148 Proposed underpinning work Taman Putra, Cheras Foundation Work May-90 Jun-90
149 Proposed condominiums Bukit Idaman Soil Investigation May-90 Jun-90
150 Proposed road Wangsa Maju Soil Investigation Apr-90 May-90
151 Proposed pipe piercing Port Klang Pipe Jacking Mar-90 Mar-90
152 Proposed development Ipoh Foundation Work Dec-89 Feb-90
153 Rock removal Wangsa Ukay Soil Investigation Nov-89 Nov-89
154 Proposed housing scheme Kepong Soil Investigation Oct-89 Nov-89
155 Proposed condominiums Bukit Tunku Soil Investigation Aug-89 Aug-89
156 Proposed slope stabilisation Taman Melawati Grouting Aug-89 Sep-89
157 Proposed factory Pasir Gudang, Johor Soil Investigation Aug-89 Sep-89
158 Proposed factory Prai Soil Investigation Jul-89 Jul-89
159 Proposed road Damansara Soil Investigation Jul-89 Jul-89
160 Proposed palm oil mill Maran Soil Investigation Jul-89 Aug-89
161 Proposed factory Pasir Gudang, Johor Soil Investigation Jun-89 Jul-89
162 Proposed bridge UUM Sintok Soil Investigation May-89 Jun-89
163 Proposed slope protection Wangsa Ukay, KL Slope Stabilisation Dec-88 Apr-89
164 Proposed development Sekinchan Soil Investigation Aug-88 Aug-88
165 Proposed development Ampang Soil Investigation Aug-88 Aug-88
166 Proposed development Brickfields Soil Investigation Jul-88 Jul-88
167 Proposed development Sri Hartamas Soil Investigation Jul-88 Jul-88
168 Compaction Test Subang Jaya Soil Investigation Jun-88 Jun-88
169 Proposed water wells Yong Peng Water well Jun-88 Jul-88
170 Diamond drilling Rawang Coring Apr-88 Jun-88
171 Proposed housing scheme Jasin, Melaka Soil Investigation Apr-88 Jun-88
172 Proposed subsoil drainage pipes Kuala Terengganu Slope Stabilisation Mar-88 Mar-88
173 Proposed development Kampung Pandan, KL Soil Investigation Mar-88 Mar-88
174 Proposed Akademi MARA Pulau Langkawi Soil Investigation Feb-88 Mar-88
175 Proposed sports complex Kuantan Soil Investigation Jan-88 Feb-88
176 Proposed earthwork Pantai Remis Soil Investigation Jan-88 Feb-88
177 Slope protection : wire netting Wangsa Ukay, KL Slope Stabilisation Jan-88 Jun-88
178 Proposed housing scheme Bukit Raja, Klang Soil Investigation Dec-87 Dec-87
179 Pile testing Tanjung Malim Soil Investigation Dec-87 Jan-88
180 Proposed communications tower Kerteh Soil Investigation Nov-87 Nov-87
181 Proposed Akademi MARA Pekan Lenggong, Perak Soil Investigation Nov-87 Nov-87
182 Proposed housing scheme Seri Gombak Soil Investigation Nov-87 Dec-87
183 Proposed development Grik Soil Investigation Oct-87 Oct-87
184 Proposed extension to spastics home Petaling Jaya Soil Investigation Oct-87 Oct-87
185 Proposed extension to factory Klang Soil Investigation Sep-87 Oct-87
186 Proposed housing development Jalan Duta, KL Soil Investigation Jul-87 Jul-87
187 Proposed bus workshop- MARA Yan, Kedah Soil Investigation Jul-87 Aug-87
188 Proposed bungalow Ampang Soil Investigation Jun-87 Jun-87
189 Proposed extension to MRSM MARA Muar, Johor Soil Investigation Jun-87 Jun-87
190 Proposed bus workshop- MARA Ipoh Soil Investigation Jun-87 Jun-87
191 Installation of piezometer standpipe Kampung Pandan Soil Investigation Jun-87 Jul-87
192 Proposed extension to MRSM MARA Jasin, Melaka Soil Investigation May-87 Jun-87
193 Proposed development Shah Alam Soil Investigation Apr-87 Apr-87
194 Proposed housing development Gombak Soil Investigation Apr-87 May-87
195 Proposed lamp post Senawang Soil Investigation Dec-86 Dec-86
196 Proposed balairaya/pasar Kelang Lama, KL Soil Investigation Sep-86 Oct-86
197 Proposed development Selayang Soil Investigation Jul-86 Jul-86
198 Proposed 4-storey building Tangkak Soil Investigation Jul-86 Aug-86
199 Proposed renovation Puchong Soil Investigation Jun-86 Jun-86
200 Proposed apartments Penang Foundation Work Jun-86 Dec-86
201 Proposed development Kelang Lama Soil Investigation May-86 Jun-86
202 Proposed development Ulu Kelang Soil Investigation Apr-86 Jun-86
203 Proposed housing scheme Ulu Kelang Soil Investigation Mar-86 Mar-86
204 Proposed development Jalan Conlay, KL Soil Investigation Mar-86 Apr-86
205 Proposed housing scheme Ulu Kelang Soil Investigation Mar-86 Apr-86
206 Proposed Akademi Mara Grik Soil Investigation Feb-86 Feb-86
207 Proposed development Ulu Kelang Soil Investigation Feb-86 Apr-86
208 Proposed Cheque Point Club Ulu Kelang Grouting Jan-86 Jan-86
209 Proposed housing scheme Ulu Kelang Soil Investigation Jan-86 May-86
210 Proposed housing development Wangsa Ukay, KL Soil Investigation Dec-85 Jan-86
211 Proposed development Jerantut Soil Investigation Jul-85 Jul-85
212 Proposed development Old Klang Road, KL Soil Investigation Jun-85 Jun-85
213 Proposed housing scheme Bukit Anggerik, Cheras Soil Investigation Jun-85 Jul-85
214 Proposed factory Bandar Baru, Bangi Soil Investigation Apr-85 Apr-85
215 Proposed housing developments Serdang Soil Investigation Apr-85 May-85
216 Proposed 9-storey apartments Penang Soil Investigation Apr-85 Jul-85
217 Proposed housing scheme Kajang Soil Investigation Apr-85 Jul-85
218 Proposed 17-storey building Ipoh Soil Investigation Jan-85 Mar-85
219 Proposed housing development Seremban Soil Investigation Dec-84 Dec-84
220 Proposed condominiums Subang Jaya Soil Investigation Dec-84 Jan-85
221 Proposed building Ipoh Soil Investigation Oct-84 Dec-84
222 Proposed housing development Gunung Rapat, Ipoh Soil Investigation Sep-84 Sep-84
223 Proposed P.E. building Jalan Ipoh, KL Soil Investigation Sep-84 Sep-84
224 Proposed building Kuala Kubu Baru Soil Investigation Sep-84 Oct-84
225 Proposed development Segambut Soil Investigation Sep-84 Nov-84
226 Proposed renovation Setapak, KL Soil Investigation Aug-84 Aug-84
227 Proposed housing development Port Dickson Soil Investigation Jul-84 Jul-84
228 Proposed housing development Taman Duta, KL Soil Investigation Jul-84 Aug-84
229 Proposed building Pasir Gudang, Johor Soil Investigation Jun-84 Jun-84
230 Proposed 31-storey apartments Lorong Jambatan, KL Soil Investigation Jun-84 Jul-84
231 Kuala Langat Mining Banting Soil Investigation May-84 May-84
232 Proposed Bridge Bahau Soil Investigation May-84 Jun-84
233 Proposed development Jalan Kelang Lama, KL Soil Investigation Apr-84 Apr-84
234 Proposed housing scheme Slim River Soil Investigation Apr-84 May-84
235 Proposed 14-storey apartments Taman Supreme, Cheras Soil Investigation Mar-84 Mar-84
236 Proposed flats Jalan Gombak, KL Soil Investigation Feb-84 Mar-84
237 Proposed 6-storey flatted factory Segambut Soil Investigation Dec-83 Dec-83
238 Proposed residential development & suction well Wangsa Ukay, KL Soil Investigation Dec-83 Jan-84
239 Proposed 2-storey bungalow Taman Duta, KL Soil Investigation Dec-83 Jan-84
240 Proposed 41/2-storey building Jalan Lemon, Seremban Soil Investigation Nov-83 Nov-83
241 Proposed development Wangsa Ukay, KL Soil Investigation Nov-83 Dec-83
242 Proposed tourist cum residential complex Jalan Air Panas, KL Soil Investigation Nov-83 Dec-83
243 Proposed 4-storey office-factory UM workshop Jalan 13/6, PJ Soil Investigation Oct-83 Oct-83
244 Proposed condominiums Taman Bandaraya Bangsar Soil Investigation Oct-83 Oct-83
245 Proposed enlargement of river Sg. Penchala, PJ Soil Investigation Oct-83 Nov-83
246 Proposed Malayan Banking Bhd Building Jalan Pudu Lama, KL Soil Investigation Oct-83 Dec-83
247 Proposed development Jalan Sultan Ismail, KL Soil Investigation Oct-83 Nov-83
248 Proposed development Kuala Langat Mine, Banting Soil Investigation Sep-83 Sep-83
249 Proposed housing scheme Slim River, Perak Soil Investigation Sep-83 Sep-83
250 Proposed 24-storey building Jalan Kuching, KL Soil Investigation Sep-83 Oct-83
251 Proposed PKNS building Jalan Tuanku Abdul Rahman, KL Soil Investigation Aug-83 Sep-83
252 Proposed 12-storey office Leboh Ampang, KL Soil Investigation Aug-83 Aug-83
253 Proposed 5-storey building Ayer Keroh, Melaka Soil Investigation Aug-83 Aug-83
254 Proposed housing scheme Kampung Tawas, Ipoh Soil Investigation Aug-83 Aug-83
255 Proposed 2-storey building Jalan Pahang, KL Soil Investigation Aug-83 Aug-83
256 Proposed R.C. elevated water tank Kuala Berang, Terengganu Soil Investigation Jul-83 Jul-83
257 Proposed 3-storey building Lorong Utara Barat, PJ Soil Investigation Jul-83 Jul-83
258 Proposed multi storey commercial complex Jalan Imbi, KL Soil Investigation Jul-83 Aug-83
259 Proposed 23-storey building Jalan Parry, KL Soil Investigation Jun-83 Jun-83
260 Proposed Ain town centre Subang Jaya Soil Investigation Jun-83 Jul-83
261 Proposed 5-storey flats Jalan Ampang, KL Soil Investigation May-83 May-83
262 Proposed housing scheme Kampung Pandan, KL Soil Investigation May-83 May-83
263 Kulai Besar Oil Mill Kulai, Johor Soil Investigation May-83 May-83
264 Proposed shopping & commercial development Jalan Ampang, KL Soil Investigation May-83 May-83
265 Proposed housing scheme Balakong, Sg Besi Soil Investigation May-83 Jun-83
266 Proposed highrise building Daya Bumi phase Soil Investigation Feb-83 Mar-83
267 Proposed housing scheme Shah Alam Soil Investigation Jan-83 Jan-83
268 Proposed extension - China Engineers Jalan Tandang, PJ Soil Investigation Dec-82 Dec-82
269 Ampang City complex Jalan Ampang, KL Soil Investigation Dec-82 Jan-83
270 Proposed flats Taman Cheras, KL Soil Investigation Nov-82 Nov-82
271 Proposed Malayan Banking Bhd Building Pudu, KL Soil Investigation Nov-82 Nov-82
272 Proposed factory Shah Alam Soil Investigation Nov-82 Nov-82
273 Proposed extension to factory Sg. Besi, KL Soil Investigation Nov-82 Nov-82
274 Proposed express highway Parit Buntar Soil Investigation Sep-82 Oct-82
275 Proposed development Jalan Parry, KL Soil Investigation Jul-82 Jul-82
276 Proposed bridge Tanjung Malim Soil Investigation Jul-82 Jul-82
277 Mercinta Hotel Skudai, Johor Bahru Soil Investigation Jun-82 Jun-82
278 Proposed Malayan Banking Bhd Building Mentakab/Termeloh Soil Investigation May-82 May-82
279 Kuala Rompin-Endau Agricultural Project Kuala Rompin Soil Investigation Feb-82 Feb-82
280 Seremban-Kuala Pilah Highway Kuala Pilah Soil Investigation Jan-82 Jan-82
281 Sediment Probe Test Bukit Aman Soil Investigation Dec-81 Dec-81
282 Proposed Bridge Bidor Soil Investigation Nov-81 Nov-81
283 Proposed Bridge Chenderiang Soil Investigation Oct-81 Oct-81
284 Proposed Reservoir Grik Soil Investigation Oct-81 Oct-81
285 Seremban-Air Hitam Highway Yong Peng Soil Investigation Sep-81 Sep-81
286 Proposed Diamond Interchange Selayang Baru Soil Investigation Aug-81 Aug-81
287 Port Dickson Interchange Port Dickson, Seremban Soil Investigation Aug-81 Aug-81
288 Proposed 30 storey building Jalan Silang, KL Soil Investigation Jul-81 Jul-81
289 Proposed Institut Teknologi Malaysia Jasin, Melaka Soil Investigation Jul-81 Jul-81
290 Proposed 4 storey building Kampung Medan Soil Investigation Jun-81 Jun-81
291 Proposed condominiums Ampang Jaya Soil Investigation Jun-81 Jun-81
292 Segamat-Air Hitam Highway Segamat Soil Investigation Jun-81 Jun-81